Monday, August 29, 2011

It is getting close!

I want to have the B-36 done for the club's electric fly in on September 11!  If I spend a couple of days on it, I think it will be ready to test fly.
I got the aileron servo covers made this evening and installed the lower nacelles on the right side of the wing.  Since I have had so much practice, I think the left side will go faster.  I did some work on the pond today, rearranging some of the liner and sealing it.  I put the first spillway back in and got it leveled while the waterfall foam cured.  I have high hopes of finishing that tomorrow.  There has always been a problem with the rocks sliding off the liner where it is on a slope.  This time I am going to try gluing the rocks down, because the waterfall foam really sticks to the liner and rock.

No comments:

Post a Comment

Jordon's Basketball and Bev's show

  11-23-2024 Jordon had a basketball game at the Y this morning.  As always it was great fun to watch. Jordon is pretty good at getting insi...