I decided to put the trailer hitch on the motor home today. The first thing I needed was some 2 inch square tubing. After a couple of stops, I went to Wayron and they had just what I wanted. I took it home, cut it to size and drilled the holes in it. After studying things for a few minutes, it looked like I needed another piece. Off to Wayron we went again. I got out of the car when we got there and discovered my billfold was home. Back home we went and then back to Wayron again. When we got home with that piece, I cut and drilled it then measured and made a list of what bolts and nuts I would need. Off to Bredfields this time and then back home to start installing things. About half way through the job I realized I had forgot one length of bolt that was on my list. Back to Bredfields again! Things went good after that and the hitch is all done and the wiring all hooked up. It was sure a nice day for working outside.
Hope you got to enjoy it!
Friday, August 13, 2010
Subscribe to:
Post Comments (Atom)
Mohs Surgery
10-9-2024 I spent a good part of this week hooking up hoses and vacuum lines. When I quit I was finished with this area except of wanting...
-
John Patrik's grandma Tami brought him down for a weekend visit, they came up today and we got to play with him. He is really a fr...
-
I spent the day doing posts on the blog. Today I published February 15th, 16th, 17th and 18th. I also did March 14 and 16th. Here is a pi...
-
3-13-2024 We broke down on I5 near Cottage Grove OR this evening just before we were planning on stopping for the night. It turned out th...
No comments:
Post a Comment