After "Coffee with the Pastor", hot chocolate for me since I never drink coffee, I went to pick up the mail and the new tombstones for the light over my building table were there. I had gotten new LED lights for it to replace the fluorescent bulbs it had before, it seemed like one of them was always burned out. The only problem turned out to be the LED tubes were powered from one end only and the tombstones did not have provisions for adding a second wire. The company that makes them sent me new tombstones but they were too large for the holes in this fixture so I found some on Amazon that would work. I put them in after lunch and I am really happy to have the work bench lit up again.
I went out to work on the nose of the P-39 but I ended up doing work on the left elevator, getting the hinges fitted and the control horn mounted. It sure rained hard today, my rain gauge is showing an inch and a half.
Wednesday, March 15, 2017
Subscribe to:
Post Comments (Atom)
Mohs Surgery
10-9-2024 I spent a good part of this week hooking up hoses and vacuum lines. When I quit I was finished with this area except of wanting...
-
John Patrik's grandma Tami brought him down for a weekend visit, they came up today and we got to play with him. He is really a fr...
-
I spent the day doing posts on the blog. Today I published February 15th, 16th, 17th and 18th. I also did March 14 and 16th. Here is a pi...
-
3-13-2024 We broke down on I5 near Cottage Grove OR this evening just before we were planning on stopping for the night. It turned out th...
No comments:
Post a Comment