This is where I was when James called today to see if I needed pellets. I did, so he stopped at Four Corners and picked up five bags for me. We were finishing up installing an air bag on the left side of the motor home. I noticed that the front end was a little lower a while back and ordered a set of air bags for the front axle. I started on it yesterday but still had a hole to finish drilling when it got dark. I finished it this morning and with Vera's help I got the bolt tightened. She was sure glad when I recruited James to help me with the right side air bag. We had a nice day for doing it, James took all the pictures and surprised me with them so I was able to do a blog tonight.
The right side went much better with James doing most of the work. He was able to get the hole drilled much faster than I did on the other side. This picture might be when I was starting to run the air lines. We both spent quite a bit of time underneath the motor home. We got the air lines ran and the valves installed. I put thirty pounds in each air bag and after retracting the jacks it looks pretty level. The next time we are somewhere level I will do a little measuring and adjust the pressures if needed. Having James do the second one sure did speed things up, if I hadn't had his help I am sure it would have taken another day.
No comments:
Post a Comment