Saturday, March 27, 2021

Back to Building

Right after breakfast this morning we went out and put the second coat of paint on the West half of the building room ceiling.  Then I went up and put the second coat of paint on the East half of the loft.  We had to wait two hours before putting the lights back up so we had lunch and then went for a ride out Ph-10.  After we got back we put the lights up, it is a lot brighter with the 5000K Led bulbs in the fixtures.
After taking the scaffolding down and putting it back in the storage container we started putting the planes and projects back so I can work on them.
 
It sure feels good to have this project done.  Now I can finish the Comet even though the Winter Build has been cancelled because of the pandemic.  We picked up dinner at BK and went down to Lions Pride Park to eat.  There was still a bunch of fishermen there.  We even saw some activity, one guy was reeling and jerking his pole up.  After watching him for awhile I think he was hung up on something.




No comments:

Post a Comment

Mohs Surgery

10-9-2024   I spent a good part of this week hooking up hoses and vacuum lines.  When I quit I was finished with this area except of wanting...