Friday, October 12, 2012
A Shop Day
After our walk in the rain shower this morning, I finished up my battery installation on the Super Cub. That battery is about twice the size of the one I had been using. After putting the cowl and propeller back on, I took it outside and checked the motor current draw. With the 13 X 10 propeller I had been using it was over 60 Amps. The motor is only rated for 60 Amps for 60 seconds or 50 Amps continuously, so I changed to a 13 X 8 propeller and is 59 Amps at full throttle. I can get by with that until I get the next size smaller, I just will not use full throttle much. I also got the T-28 repaired, one wheel fell off when I made a touch and go Wednesday, damaging the gear door. Turbo Bee got a little attention also, I got the lower bearing installed on the rudder. It is now ready to cover. I made a trip over to Steve and Dianne's this afternoon, Ava and Harper were painting. That was fun to watch, I am not sure how Harper got paint on her elbow but it looked cute. I spent the evening watching TV, working on my blogs and taking a nap.
Subscribe to:
Post Comments (Atom)
Mohs Surgery
10-9-2024 I spent a good part of this week hooking up hoses and vacuum lines. When I quit I was finished with this area except of wanting...
-
John Patrik's grandma Tami brought him down for a weekend visit, they came up today and we got to play with him. He is really a fr...
-
I spent the day doing posts on the blog. Today I published February 15th, 16th, 17th and 18th. I also did March 14 and 16th. Here is a pi...
-
3-13-2024 We broke down on I5 near Cottage Grove OR this evening just before we were planning on stopping for the night. It turned out th...
No comments:
Post a Comment